- Full down to the studs remodel in 2019 -2020 with:
- All New Electrical
- All New Plumbing
- All New Insulation (spray foam throughout)
- New Appliances
- Smart Home Enabled Light Switches
- Wired for Multi-Zone Surround Sound
- New HVAC 2022
- New 300 sqft addition of primary bath and closet with skylight and pine wood vaulted ceilings 2022
- Added 600 sqft of 50 year TimberTech composite deck 2022
- Plumbed for outdoor shower 2022
|
- Full down to the studs remodel in 2019 -2020 with:
- All New Electrical
- All New Plumbing
- All New Insulation (spray foam throughout)
- New Appliances
- Smart Home Enabled Light Switches
- Wired for Multi-Zone Surround Sound
- New HVAC 2022
- New 300 sqft addition of primary bath and closet with skylight and pine wood vaulted ceilings 2022
- Added 600 sqft of 50 year TimberTech composite deck 2022
- Plumbed for outdoor shower 2022
|